Question: 1
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?
Please choose the correct answer. Response:
A. By providing replenishment proposals with exact times
B. By providing cross-plant planning and deployment
C. By providing future demands from demand figures in the past
D. By providing multilevel material requirements planning
Answer: A
Question: 2
The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders”
There are 2 correct answers to this question. Response:
A. Creating a planned order within the planning time fence
B. Assigning a production scheduling profile
C. Setting a planning time fence in the Material Master Record
D. Manually changing the quantity of a planned order
Answer: A, C
Question: 3
In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate?
Please choose the correct answer. Response:
A. The presence of production orders
B. The presence of firmed planned orders
C. The viability of the proposed solution
D. The priority of the proposed solution
Answer: C
Question: 4
Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question.
Response:
A. Change sales order quantities
B. Enter time-ticket confirmation for production orders
C. Change planned order quantities
D. Undo for drag & Drop planning activities
Answer: C, D
Question: 5
What are the three transition scenarios for a S/4HANA implementation? There are 3 correct answers to this question.
Response:
A. Landscape transformation
B. System activation
C. System conversion
D. New implementation
E. System upgrade
Answer: A, C & D
Question: 6
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question.
Response:
A. SAP S/4HANA on-premise
B. SAP S/4HANA Professional services cloud
C. SAP S/4HANA private cloud
D. SAP S/4AHANA Enterprise Management cloud
Answer: A & C
Question: 7
What are the pillars of SAP Activate?
There are 2 correct answers to this question. Response:
A. SAP Best Practices
B. Premium engagement
C. SAP MaxAttention
D. Guided Configuration
Answer: A & D
Question: 8
When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question.
Response:
A. When goods issues can wait for final confirmation
B. For production lines with short lead times
C. You require an up-to-date inventory for components
D. When you need to determine the work in progress
Answer: A & D
Question: 9
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question. Response:
A. Material master
B. Work center
C. Production plant
D. Contract
Answer: C & D
Question: 10
Which data object can be updated with the scheduling results of a routing? Please choose the correct answer.
Response:
A. Production scheduling profile
B. MRP profile
C. Material master
D. Production version
Answer: C
Question: 11
Which Kanban master data object controls the relationship between the supply and demand source? Please choose the correct answer.
Response:
A. Kanban container
B. Control cycle
C. Production supply area
D. Rate routing
Answer: B
Question: 12
Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question.
Response:
A. SAP GTS replaces ERP SD Foreign Trade
B. SAP Revenue Accounting replaces ERP SD Revenue Recognition
C. SAP Sales Support replaces SAP CRM
D. Settlement Management replaces ERP SD Rebates
E. SAP order Fulfillment replaces ERP SD Availability Checking
Answer: A, B & D
Question: 13
Which warehouse management functions are available in SAP EWM but NOT in SAP WM? There are 3 correct answers to this question.
Response:
A. Slotting
B. Labor Management
C. Expected goods receipt
D. Handling Unit Management
E. Yard Management
Answer: A, B & C
Question: 14
A planner updated a production order status from partially confirmed “PCNF” to technically completed
“TECO” by mistake.
What impact would this have to other users for this specific production order? Please choose the correct answer.
Response:
A. The production operator cannot enter additional confirmations
B. The warehouse clerk still carry out goods issue transactions
C. The buyer can still see component reservations
D. The production manager can still see the capacity requirements
Answer: A
Question: 14
What are the main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question.
Response:
A. Material Coverage Fiori app
B. Flow manufacturing
C. Monitor Production Orders Fiori app
D. Lock-free inventory movements
E. Rough-cut capacity planning
Answer: A, C & D
Question: 15
At the end of the MRP run, you receive the exception message “Reschedule In Operation”. What caused the message to be generated?
Please choose the correct answer. Response:
A. A firmed planned receipt cannot be rescheduled
B. The requirements date occurs that of a firmed planned receipt
C. The requirement no longer exists
D. The requirements date occurs before that of a firmed planned receipt
Answer: D
Question: 16
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question.
Response:
A. Default unit of measure
B. Allowed material type
C. Default values for the item status
D. Maximum allowed low-level code
Answer: B & D
Question: 17
How Is the bill of material (BOM) exploded when you use a BOM explosion number? Please choose the correct answer.
Response:
A. With respect to defined separate key dates for product and each assembly
B. With respect to a common key date for the product and each assembly
C. With respect to defined separate change status for the product and each assembly
D. With respect to common change status for the product and each assembly
Answer: A
Question: 18
What are the prerequisites for using batch derivation? There are 2 correct answers to this question.
Response:
A. Batch determination selection conditions
B. Receiver-sender relationships
C. Batch where-used list
D. Process instructions
Answer: B & C
Question: 19
What are the properties of MRP Live?
There are 2 correct answers to this question. Response:
A. It uses the same BAdis as classic MRP
B. It is executed on the database server
C. The code is written in SQL Script
D. Data is read sequentially from the database tables
Answer: B & C
Question: 20
Which process order function uses a resource network? Please choose the correct answer.
Response:
A. Capacity planning
B. Resource selection
C. Resource scheduling
D. Capacity leveling
Answer: B
Question: 21
A. Backorder processing
B. Supply Network Planning
C. Capacity planning
D. Available-to-promise
E. Demand planning
Answer: A, C & D
Question: 22
Which of these are layers in SAP Best Practice content? There are 3 correct answers to this question.
Response:
A. Configuration guides
B. Building blocks
C. Process diagrams
D. Solution packages
E. Scope items
Answer: B, D & E
Question: 23
Which SAP solutions are part of the Digital Value Network portfolio? There are 3 correct answers to this question.
Response:
A. SAP Visual Enterprise
B. SAP Hybris
C. SAP Human Capital Management
D. SAP Fieldglass
E. Concur
Answer: B, D & E
Question: 24
Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question.
Response:
A. Elimination of output condition tables
B. Elimination of document index tables
C. Elimination of status tables
D. Elimination of customer master tables
E. Elimination of LIS tables for rebates
Answer: B, C & D
Question: 25
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer. Response:
A. Costs
B. Quota arrangement
C. Component availability
D. Vendor rating
E. Delivery date
Answer: B
Question: 26
What must be used in the system to plan the requirements for different subcontractors separately? Response:
A. MRP areas
B. Storage locations
C. Production versions
D. Planning plant
Answer: A
Question: 27
The production plan is being disrupted by last-minute demands that are entered into the system. Which is the most efficient way to handle last-minute demands and protect the current production plan?
There are 2 correct answers to this question. Response:
A. In the material master record set MRP type to P1 and a planning time fence on the replenishment lead time of the material
B. In the stock requirements list set a manual firming fence for a date based on the replenishment lead time of the material
C. In the material master record set MRP type to P4 and a planning time fence on the replenishment lead time of the material
D. Manually firm all planned orders for materials within the replenishment lead time of the material
Answer: B & D
Question: 28
What are the attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question.
Response:
A. It is only a grouping of related technical simplifications
B. It can have a business and a technical impact
C. It was created for better planning and estimation of your way to S/4HANA
D. It details transaction and solution capabilities at a functional level
E. It contains references to the relevant training material
Answer: B, C & D
Question: 29
What are some of the advantages of using Kanban? There are 2 correct answers to this question.
Response:
A. Replenishments are created close to the actual need
B. Replenishments are based on centralized planning
C. It is a simplified form of production control
D. It is mostly accomplished by manual postings
Answer: A & C
Question: 30
How can you enhance the system statuses of a production order scenario with user statuses? Please choose the correct answer.
Response:
A. By activating the user statuses in status and action management
B. By creating a user profile and assigning it to the production scheduling profile
C. By enhancing the system status customizing table with user statuses
D. By defining a status profile and assigning it to the order type
Answer: C
Visit Our Website To Learn from Our Industry Experts
Question: 31
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question. Response:
A. Forecast
B. Drilldown
C. Sort
D. Scheduling
E. Filters
Answer: B, C & E
Question: 32
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products?
Please choose the correct answer. Response:
A. By assigning the same production version to different materials
B. By creating routings with parallel sequences
C. By assigning different materials to the same routing
D. By creating routings with alternative sequences
Answer: C
Question: 33
The pegging situation was changed because of an MRP heuristic run. What is the capability of dynamic pegging?
Response:
A. It links receipts from an alternative location in case of a shortage in the default location
B. It propagates changed sales order priorities to the pegged planned orders
C. It replaces fixed pegging relationships unless they have been created for stock
D. It enables the propagation of network alerts across the bill of materials structure
Answer: A
Question: 34
A customer is considering switching from order-related settlement to product-related settlement. What are the capabilities of cost collectors?
There are 2 correct answers to this question. Response:
A. They can be used for manufacturing with collective orders.
B. They can be created automatically during the month-end process.
C. They can be applied to make-to-stock production orders.
D. They can be used for repetitive manufacturing.
Answer: C & D
Question: 35
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question.
Response:
A. MRP Live can create production orders automatically
B. MRP Live can plan materials with recursive BOMs
C. MRP Live can propose alternative solutions
D. MRP Live can priorities demand from sales orders
Answer: A & C
Question: 36
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer.
Response:
A. ABAP Managed Core Data Services (CDS)
B. Smart Business Cockpit
C. HANA Live
D. Multidimensional Reporting client (MDRC)
Answer: A
Question: 37
What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question.
Response:
A. Backorder processing
B. Heuristics
C. Demand consumption
D. Detailed scheduling functions
E. Optimization
Answer: B, D & E
Question: 38
In the first step, you have created master recipes. In which sequence are the additional objects created? Please choose the correct answer.
Response:
A. Process order Control recipe Process message PI sheet
B. Control recipe Process order
PI sheet
C . Process message Control recipe Process order Process message PI sheet
D. Process order Control recipe PI sheet Process message
Answer: D
Question: 39
Which elements are included in the structure of the batch where-used list? There are 3 correct answers to this question.
Response:
A. Stock transfers
B. Collective orders
C. Purchase orders
D. Transfers from batch to batch
E. Planned orders
Answer: A, C & D
Question: 40
When the receipt of the good for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question. Response:
A. Archiving of backflush documents
B. Posting of production costs to cost collector
C. Staging of components for the next order in the sequence
D. Reduction of the capacity requirements
Answer: A & B
Question: 41
The setup time on the production line to produce material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this? Please choose the correct answer.
Response:
A. Exact lot sizing
B. Periodic lot sizing
C. Minimum lot sizing
D. Fixed lot sizing
Answer: B
Question: 42
Which of the following is used by the MRP Live planning run in SAP S/4HANA? Please choose the correct answer.
Response:
A. Planning horizon
B. Parallel processing across servers
C. Net change planning
D. MRP list
Answer: C
Question: 43
During planning, you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan?
There are 3 correct answers to this question. Response:
A. Use a bucket-oriented capacity check
B. Use DS heuristic “Schedule Sequence”
C. Use rescheduling with an alternative mode
D. Use multilevel MRP run for the products on the resource
E. Use optimization with respect to set-up times
Answer: B, C & E
Question: 44
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed?
There are 2 correct answers to this question. Response:
A. Individual operations
B. Individual process instructions
C. Individual phases
D. Individual control recipes
Answer: A & C
Question: 45
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Please choose the correct answer.
Response:
A. Cost collector
B. Bill of material
C. Repetitive manufacturing profile
D. Production version
Answer: D
Question: 46
Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question.
Response:
A. In the requirements class
B. In the plant parameters
C. In the MRP group
D. In the material master
Answer: C & D
Question: 47
In which of the following master data objects can you define the production order default storage location for a material component?
A. Routing, in the component allocation
B. BOM, in the item for the material
C. Work center, in the production supply area
D. Material master of the finished product
Answer: A & B
Question: 48
Which capabilities does the Alert monitor have? There are 3 correct answers to this question.
Response:
A. Automatically predict alerts in future planning cycles
B. Automatically send alerts with Alert Notification Engine
C. Nominate time-dependent substitutes for a planner
D. Automatically reschedule in case of overload alerts
E. Generate alerts based on defined threshold values
Answer: B, C & E
Question: 49
In order to use strategy 70 – Planning At Assembly Level, what order field must be set beside the planning strategy?
Please choose the correct answer. Response:
A. Dependent Requirements indicator
B. Individual/Collective Indicator
C. Storage Location MRP Indicator
D. Mixed MRP indicator
Answer: D
Question: 50
Before a user can add multiple production versions in a material master, what information should be collected?
A. BOM status
B. Validity dates
C. Work center hierarchy
D. Task list group number
E. Lot sizes
Answer: A. B & E
Question: 51
Which material-specific information can be transferred to a transportation lane in PP/DS? There are 3 correct answers to this question.
Response:
A. Purchasing info records
B. Special procurement keys
C. Outline agreement
D. Quota arrangements
E. Production versions
Answer: A, B & C
Question: 52
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend?
Please choose the correct answer. Response:
A. Release order parts
B. Kanban
C. Pick parts
D. Crate parts
Answer: C
Question: 53
Your customer complains about the incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question. Response:
A. Processing time
B. Move time
C. Queue time
D. Floating time
E. Tear downtime
Answer: B, C & D
Question: 54
A warehouse manager likes to streamline the receipt of the goods (GR) process for production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question. Response:
A. Operation control key
B. Scheduling margin key
C. Production scheduling profile
D. Confirmation profile
Answer: A, C
Question: 55
Which of the following data objects are updated when a user confirms an operation? Please choose the correct answer.
Response:
A. Production order total order quantity
B. Production order header status
C. Warehouse transfer order status
D. Shop floor information system
Answer: D
Question: 56
In Make-to-order production, which field controls whether the components will be planned as sales order-specific stock?
Please choose the correct answer. Response:
A. The Individual/Collective indicator of the component
B. The item category of the component in the BOM
C. The MRP Type of the component
D. The Planning Strategy of the finished product
Answer: D
Question: 57
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.
Which is the appropriate planning strategy to use? Please choose the correct answer.
Response:
A. Planning without final assembly (50)
B. Planning with final assembly (40)
C. Production by lot size (30)
D. Make-to-order production (20)
Answer: A
Question: 58
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are 3 correct answers to this question.
Response:
A. Routing
B. Bill of Material
C. Engineering Change Record
D. Production Version
Answer: A, B & D
Question: 59
Which automotive-specific functionality is embedded in SAP S/4HANA? There are 3 correct answers to this question.
Response:
A. Equipment and Tools Management
B. Enhanced characteristics based processes
C. Packaging Logistics
D. Parts interchangeability
E. Enhanced Kanban Processing
Answer: C, D & E
Question: 60
You are using the document management system (DMS). Where should the DMS document links be assigned, have them automatically copied to production orders?
There are 2 correct answers to this question. Response:
A. Material master
B. Bill of material
C. Routing header
D. Work center
Answer: A & B
Question: 61
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question.
Response:
A. Operation list
B. Production list
C. WIP list
D. Planning file entries
E. Production overview
Answer: A. C & E
Question: 62
Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question.
Response:
A. Advances in the three-tier architecture approach
B. Big and affordable memory
C. Capability to add to server landscape and scale
D. Wide adoption of web standards such as Service-oriented architecture
E. Multi-core processors enabling parallelism of tasks
Answer: B, C & E
Question: 63
When do you recommend the use of repetitive manufacturing? There are 2 correct answers to this question.
Response:
A. Low product stability
B. High product stability
C. High product complexity
D. Low product complexity
Answer: B, D
Question: 64
On which of the following levels can you influence the availability check for the components of production orders?
There are 2 correct answers to this question. Response:
A. Material master
B. Production order type
C. Production controller
D. MRP controller
Answer: A, D
Question: 65
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment? There are 2 correct answers to this question.
Response:
A. Stock transfer
B. In-house production
C. Subcontracting
D. Vendor consignment
Answer: A, B
Question: 66
What are some of the SAP Fiori user types? There are 3 correct answers to this question. Response:
A. Employee
B. Business partner
C. Expert
D. Occasional
E. Developer
Answer: C, D & E
Question: 67
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Response:
A. Finite resource and finite strategy
B. Infinite resource and infinite strategy
C. Infinite resource and finite strategy
D. Finite resource and infinite strategy
Answer: A
Question: 68
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more than the forecasted quantity, you want to increase production to try to meet the extra demand.
Which is the appropriate planning strategy to use? Response:
A. 40 – Planning with-final-assembly
B. 10 – Anonymous make-to-stock
C. 20 – Make to order production
D. 50 – Planning without final assembly
Answer: A
Question: 69
In which material master views can you select the batch management checkbox? There are 2 correct answers to this question.
Response:
A. MRP 4
B. Purchasing
C. Work Scheduling
D. Basic Data 1
Answer: B, C
Question: 70
The procurement type of your material is set to “E” for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer. Response:
A. Selection Method
B. Production Version
C. Purchasing Info Record
D. Contract
Answer: B
Question: 71
What are the drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.
Response:
A. Only the OLAP system has the latest data
B. The OLAP system needs to write back the data to the OLTP system
C. Multiple copies of the data exist
D. Batch process is required to keep OLTP and OLAP in sync
E. Only the OLAP system has a predefined subset of the data
Answer: B, C, D & E
Question: 72
How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answers to this question.
Response:
A. Use a planning strategy with requirements consumption
B. Maintain adjustment parameter in the MRP group
C. Reorganize planned independent requirements
D. Set the requirements reduction indicator in the requirements class
Answer: B & C
Question: 73
What Kanban status automatically posts goods receipt with reference to the procurement element? Please choose the correct answer.
Response:
A. Full
B. Empty
C. In use
D. Wait
Answer: A
Question: 74
Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Please choose the correct answer.
Response:
A. Outbound delivery order
B. Outbound delivery request
C. Warehouse order
D. Warehouse task
Answer: B
Question: 75
What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer. Response:
A. PP Standard Sales and Operations Planning
B. Flexible Planning
C. APO Demand Planning
D. Integrated Business Planning
Answer: D
Question: 76
What is the first step in the MRP run? Please choose the correct answer.
Response:
A. Lot size calculation
B. BOM explosion
C. Source determination
D. Net requirements calculation
Answer: D
Question: 77
Which of the following apply to MRP Live? There are 2 correct answers to this question. Response:
A. The sequence of planning materials is calculated across plants.
B. The BAdIs for classical MRP also applies to MRP Live.
C. The definition of the planning scope is more flexible.
D. Planned orders need to be converted to purchase requisitions for externally procured materials.
Answer: A, C
Question: 78
For which planning-relevant data objects do you set just one indicator to include then in PP/DS? There are 2 correct answers to this question.
Response:
A. Plant
B. Production version
C. Work center
D. Material
Answer: C, D
Question: 79
Which task list types can have parallel sequences? There are 2 correct answers to this question.
Response:
A. Routings (N)
B. Rate routings (R)
C. Master recipes (2)
D. Reference operation sets (S)
Answer: AB
Question: 80
When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question.
Response:
A. You require an up-to-date inventory for components
B. When goods issues can wait for final confirmation
C. For production lines with short lead times
D. When you need to determine the work in progress
Answer: B, D
Question: 81
Which of the following apply to MRP Live? There are 2 correct answers to this question. Response:
A. The sequence of planning materials is calculated across plants.
B. Planned orders need to be converted to purchase requisitions for externally procured materials.
C. The definition of the planning scope is more flexible.
D. The BAdIs for classical MRP also apply to MRP Live.
Answer: A, C
Question: 82
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question. Response:
A. By eliminating hybrid tables
B. By eliminating inventory tables
C. By eliminating material master tables
D. By eliminating fields for different stock types
E. By eliminating inventory history tables
Answer: B, D & E
Question: 83
Which warehouse management functions are available in SAP EWM but NOT in SAP WM? There are 3 correct answers to this question.
Response:
A. Handling Unit Management
B. Yard Management
C. Expected goods receipt
D. Labor Management
Answer: C, D & E
Question: 84
In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate?
Please choose the correct answer. Response:
A. The viability of the proposed solution
B. The priority of the proposed solution
C. The presence of firmed planned orders
D. The presence of production orders
Answer: A
Question: 85
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer. Response:
A. Material Master –> MRP Group –> Plant Settings
B. Plant Settings –> MRP Group –> Material Master
C. Material Master –> Plant Settings –> MRP Group
D. MRP Group –> Material Master –> Plant Settings
Answer: A
Want To Learn More? Visit Our Course Page To Know More
Question: 86
What are the three transition scenarios for a S/4HANA implementation? There are 3 correct answers to this question.
Response:
A. System conversion
B. System upgrade
C. New implementation
D. Landscape transformation
Answer: A, C & D
Question: 87
When the receipt of the goods for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default?
There are 2 correct answers to this question. Response:
A. Posting of production costs to cost collector
B. Archiving of backflush documents
C. Staging of components for the next order in the sequence
D. Reduction of the capacity requirements
Answer: A & B
Question: 88
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability.
Which information is required to implement this change request in the scope of check? There are 2 correct answers to this question.
Response:
A. The checking rule from the business application
B. The checking group from the material master
C. The checking control for the order type
D. The ATP category for restricted-use stock
Answer: A & B
Question: 89
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer.
Response:
A. Smart Business Cockpit
B. Multidimensional Reporting client (MDRC)
C. HANA Live
D. ABAP Managed Core Data Services (CDS)
Answer: D
Question: 90
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are 3 correct answers to this question.
Response:
A. Bill of Material
B. Routing
C. Engineering Change Record
D. Production Version
Answer: A. B & D
Question: 91
Which of the following data objects are updated when a user confirms an operation? Please choose the correct answer.
Response:
A. Warehouse transfer order status
B. Production order header status
C. Production order total order quantity
D. Shop floor information system
Answer: D
Question: 92
When do you recommend the use of repetitive manufacturing? There are 2 correct answers to this question.
Response:
A. High product complexity
B. Low product stability
C. Low product complexity
D. High product stability
Answer: C & D
Question: 93
What is the first step in the MRP run? Please choose the correct answer.
Response:
A. Net requirements calculation
B. BOM explosion
C. Source determination
D. Lot size calculation
Answer: A
Question: 94
To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend?
Please choose the correct answer. Response:
A. Pick parts
B. Kanban
C. Crate parts
D. Release order parts
Answer: A
Question: 95
Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question.
Response:
A. Change planned order quantities
B. Undo for drag & Drop planning activities
C. Enter time-ticket confirmation for production orders
D. Change sales order quantities
Answer: A & B
Question: 96
The setup time on the production line to produce material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this? Please choose the correct answer.
Response:
A. Periodic lot sizing
B. Exact lot sizing
C. Fixed lot sizing
D. Minimum lot sizing
Answer: A
Question: 97
Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question.
Response:
A. In the MRP group
B. In the requirements class
C. In the plant parameters
D. In the material master
Answer: A & D
Question: 98
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Please choose the correct answer.
Response:
A. Repetitive manufacturing profile
B. Production version
C. Cost collector
D. Bill of material
Answer: B
Question: 99
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy is required to receive related alerts?
Response:
A. Infinite resource and finite strategy
B. Finite resource and infinite strategy
C. Infinite resource and infinite strategy
D. Finite resource and finite strategy
Answer: D
Question: 100
How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answers to this question.
Response:
A. Maintain adjustment parameter in the MRP group
B. Set the requirements reduction indicator in the requirements class
C. Reorganize planned independent requirements
D. Use a planning strategy with requirements consumption
Answer: AC
Question: 101
The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders”
There are 2 correct answers to this question. Response:
A. Creating a planned order within the planning time fence
B. Manually changing the quantity of a planned order
C. Setting a planning time fence in the Material Master Record
D. Assigning a production scheduling profile
Answer: A & C
Question: 102
How can you enhance the system statuses of a production order scenario with user statuses? Please choose the correct answer.
Response:
A. By creating a user profile and assigning it to the production scheduling profile
B. By defining a status profile and assigning it to the order type
C. By enhancing the system status customizing table with user statuses
D. By activating the user statuses in status and action management
Answer: C
Question: 103
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named
“W1904_1000_001”. What does the suffix 001 in the resource name represent? Please choose the correct answer.
Response:
A. Work center category
B. Available capacity version
C. Capacity category
D. Number of individual capacities
Answer: C
Question: 104
Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Please choose the correct answer.
Response:
A. Warehouse task
B. Outbound delivery request
C. Warehouse order
D. Outbound delivery order
Answer: B
Question: 105
What are the attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question.
Response:
A. It contains references to the relevant training material
B. It was created for better planning and estimation of your way to S/4HANA
C. It can have a business and a technical impact
D. It is only a grouping of related technical simplifications
E. It details transaction and solution capabilities at a functional level
Answer: B, C & E
Question: 106
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Please choose the correct answer. Response:
A. Vendor rating
B. Quota arrangement
C. Delivery date
D. Component availability
E. Costs
Answer: B
Question: 107
Which of the following functions can be performed when the production order has the status “Created”
(CRTD)?
Please choose the correct answer. Response:
A. A user trigger material availability check via mass processing (transaction COHV)
B. A user trigger printing of shop floor paper manually (transaction CO02).
C. A user can schedule a background job to release production orders (transaction COOIS).
D. A user can trigger material staging via mass processing (transaction COHV).
Answer: B
Question: 108
What are the prerequisites for using batch derivation? There are 2 correct answers to this question.
Response:
A. Batch where-used list
B. Process instructions
C. Batch determination selection conditions
D. Receiver-sender relationships
Answer: A & D
Question: 109
What is the correct sequence of the following Activate methodology phases? Please choose the correct answer.
Response:
A. Prepare, Validate, Test, Go-Live
B. Prepare, Realize, Iterate, Continuous Improvement
C. Validate, Realize, Test, Deploy
D. Prepare, Explore, Realize, Deploy
Answer: D
Question: 110
Which process order function uses a resource network? Please choose the correct answer.
Response:
A. Capacity leveling
B. Resource selection
C. Capacity planning
D. Resource scheduling
Answer: B
Question: 111
Which of the following is used by the MRP Live planning run in SAP S/4HANA? Please choose the correct answer.
Response:
A. Net change planning
B. Parallel processing across servers
C. Planning horizon
D. MRP list
Answer: A
Question: 112
What are the pillars of SAP Activate?
There are 2 correct answers to this question. Response:
A. SAP MaxAttention
B. Premium engagement
C. SAP Best Practices
D. Guided Configuration
Answer: C, D
Question: 113
What are some of the advantages of using Kanban? There are 2 correct answers to this question.
Response:
A. Replenishments are based on centralized planning
B. Replenishments are created close to the actual need
C. It is mostly accomplished by manual postings
D. It is a simplified form of production control
Answer: B, D
Question: 114
The procurement type of your material is set to “E” for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer. Response:
A. Contract
B. Purchasing Info Record
C. Selection Method
D. Production Version
Answer: D
Question: 115
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.
Response:
A. Strategic analysis
B. Automatic update of storyboards
C. Comparison of current data with historical data to identify trends
D. Real-time decision support
Answer: A & D
Question: 116
In order to use strategy 70 – Planning At Assembly Level, what order field must be set beside the planning strategy?
Please choose the correct answer. Response:
A. Dependent Requirements indicator
B. Mixed MRP indicator
C. Individual/Collective Indicator
D. Storage Location MRP Indicator
Answer: B
Question: 117
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.
Which is the appropriate planning strategy to use? Please choose the correct answer.
Response:
A. Planning without final assembly (50)
B. Production by lot size (30)
C. Make-to-order production (20)
D. Planning with final assembly (40)
Answer: A
Question: 118
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? There are 2 correct answers to this question.
Response:
A. Setup time
B. Float before and float after production
C. Opening period
D. Goods receipt processing time
Answer: A & B
Question: 119
What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question.
Response:
A. Heuristics
B. Detailed scheduling functions
C. Optimization
D. Backorder processing
E. Demand consumption
Answer: A, B & C
Question: 120
In which customizing activity do you set up automatic routing selection for production orders? Please choose the correct answer.
Response:
A. Define scheduling parameters for production orders
B. Define production scheduling profile
C. Define order-type-dependent parameter
D. Define selection profiles
Answer: C
Question: 121
Which material master setting is required to use the repetitive planning table for production with production orders?
Please choose the correct answer. Response:
A. An overall profile be assigned on the Work Scheduling view
B. At least one valid production version must exist on the MRP4 view
C. A repetitive manufacturing profile must be assigned on the MRP4 view
D. The Selection Method must be set to “2 Selection by production version”.
Answer: C